Biomass boiler plant Fjernvarme, Denmark

Production, transport and assembly of steel structure for a biomass boiler plant with floor plan dimensions of 35.5 x 37.2 m, 43-m high, and the corresponding service steel structures. In essence, the work consisted of replacing all steel structures with new ones, while the supporting reinforced concrete framework of the existing boiler plant was preserved. Part of the work supplied was the manufacturing documentation for the secondary steel structures of railings, floor grates and floor plates.

neprelozene Rok realizácie
2022
neprelozene Investor
Fjernvarme Fyn
neprelozene Objednávateľ
Andritz Oy
neprelozene Hmotnosť konštrukcie
1380 t
PROJECTS

neprelozene PREMENÍME VAŠE SNY NA REALITU

Sanen Luxembourg
Kronospan CHP3 regeneration boiler plant,
Ivachnová, Slovakia
Construction of Ivachnová mall
Kemi, Finland
Regeneration boiler plant
Frovi, Sweden
Regeneration boiler plant BillerudKorsnäs,
Fjernvarme, Denmark
Biomass boiler plant
Bratislava, Slovakia
New construction and partial rehabilitation of the H1 Volkswagen welding plant in
Tampere, Finland
Biomass boiler plant Naistenlahti 3
Husum, Sweden
Boiler plant of Metsä Board recovery boiler
Kazincbarcika, Hungary
Pipe bridges, production and operational facilities Borsodchem
Uppsala, Sweden
Biomass boiler plant Vattenfall