Steel and concrete bridge "Čadečka" on the D3 Svrčinove-Skalité expressway, Slovakia

Production and assembly of steel structure of a continuous 9-span reinforced concrete bridge with a total length of 690 m and individual spans of 52.5 + 69 + 81 + 4×87 + 75 + 64.5 m. The cross-section of the bridge consists of a pair of steel welded I-beams of a constant height of 4.30 m made of S460NL steel and a bonded reinforced concrete slab. The assembly of the steel structure was carried out by the extension method. Part of the work supplied was also the manufacturing and assembly documentation.

neprelozene Rok realizácie
2014-2015
neprelozene Investor
Národná diaľničná spoločnosť, a.s.
neprelozene Objednávateľ
Doprastav, a.s.
neprelozene Hmotnosť konštrukcie
2700 t
PROJECTS

neprelozene PREMENÍME VAŠE SNY NA REALITU

Sanen Luxembourg
Kronospan CHP3 regeneration boiler plant,
Ivachnová, Slovakia
Construction of Ivachnová mall
Kemi, Finland
Regeneration boiler plant
Frovi, Sweden
Regeneration boiler plant BillerudKorsnäs,
Fjernvarme, Denmark
Biomass boiler plant
Bratislava, Slovakia
New construction and partial rehabilitation of the H1 Volkswagen welding plant in
Tampere, Finland
Biomass boiler plant Naistenlahti 3
Husum, Sweden
Boiler plant of Metsä Board recovery boiler
Kazincbarcika, Hungary
Pipe bridges, production and operational facilities Borsodchem
Uppsala, Sweden
Biomass boiler plant Vattenfall