Steel and concrete bridge "Vŕšok" on the D3 Svrčinovec-Skalité expressway, Slovakia

Installation of the steel structure of a continuous 6-span reinforced concrete bridge with a total bridge length of 420 m and individual spans of 69.0 + 81.0 + 87.0 + 75 + 63.0 + 45.0m. The cross-section of the bridge consists of a pair of steel welded I-beams with a constant height of 4.30 m of S460NL steel and a bonded reinforced concrete slab. The assembly of the steel structure was carried out by the extension method.

neprelozene Rok realizácie
2014-2015
neprelozene Investor
Národná diaľničná spoločnosť, a.s.
neprelozene Objednávateľ
Doprastav, a.s.
neprelozene Hmotnosť konštrukcie
1600 t
PROJECTS

neprelozene PREMENÍME VAŠE SNY NA REALITU

Sanen Luxembourg
Kronospan CHP3 regeneration boiler plant,
Ivachnová, Slovakia
Construction of Ivachnová mall
Kemi, Finland
Regeneration boiler plant
Frovi, Sweden
Regeneration boiler plant BillerudKorsnäs,
Fjernvarme, Denmark
Biomass boiler plant
Bratislava, Slovakia
New construction and partial rehabilitation of the H1 Volkswagen welding plant in
Tampere, Finland
Biomass boiler plant Naistenlahti 3
Husum, Sweden
Boiler plant of Metsä Board recovery boiler
Kazincbarcika, Hungary
Pipe bridges, production and operational facilities Borsodchem
Uppsala, Sweden
Biomass boiler plant Vattenfall