Suspended steel and concrete footbridge for pedestrians and cars Turčianske Kľačany, Slovakia

Installation of the steel structure of the bridge deck and pylons of a 3-area steel and concrete suspended bridge with the total bridge length of 170 m and individual spans of 37.8 + 94.5 + 37.8 m. The pylons in the shape of the letter "V" were erected above the middle supports of the bridge at about 18 m above the deck and were made of reinforced concrete coupled with an elliptical cross section. The steel orthotropic bridge with two main girders is suspended on fan-shaped hinges (the so-called semi-harp system). Assembly took place with the help of truck cranes on suitably placed assembly supports built in the bed of the river Váh. In addition to pedestrians and cyclists, the footbridge also serves passenger cars up to 3.5 tons.

neprelozene Rok realizácie
2012
neprelozene Investor
Národná diaľničná spoločnosť, a.s.
neprelozene Objednávateľ
Váhostav – SK, a.s.
neprelozene Hmotnosť konštrukcie
225 t
PROJECTS

neprelozene PREMENÍME VAŠE SNY NA REALITU

Sanen Luxembourg
Kronospan CHP3 regeneration boiler plant,
Ivachnová, Slovakia
Construction of Ivachnová mall
Kemi, Finland
Regeneration boiler plant
Frovi, Sweden
Regeneration boiler plant BillerudKorsnäs,
Fjernvarme, Denmark
Biomass boiler plant
Bratislava, Slovakia
New construction and partial rehabilitation of the H1 Volkswagen welding plant in
Tampere, Finland
Biomass boiler plant Naistenlahti 3
Husum, Sweden
Boiler plant of Metsä Board recovery boiler
Kazincbarcika, Hungary
Pipe bridges, production and operational facilities Borsodchem
Uppsala, Sweden
Biomass boiler plant Vattenfall